Skip to content
  • Home
  • Boating
    • Safety
      • Cautions
      • Crossing Bars
    • Webcams
    • Waves, Tides & Weather
    • Navigation Information
    • Waterways Online
    • Boating Guides
    • Boating Facilities
  • Ports & Waterways
    • Port Management
      • Port of Anderson Inlet
      • Port of Corner Inlet & Port Albert
      • Port of Gippsland Lakes
      • Port of Mallacoota Inlet
      • Port of Snowy River (Marlo)
      • Lake Tyers
      • Shallow Inlet
      • Tamboon Inlet
      • Sydenham Inlet
    • Sand Management
    • Environment
    • Current & Planned Works
    • Permits & Authorities
  • Notices & Alerts
    • Notice to Mariners & Warnings
    • Media Releases & Local News
  • Services
    • Commercial Shipping
    • Commercial Services
    • Berths & Moorings
    • Online Site Induction
  • Publications
    • Plans
    • Bathymetric Surveys
    • Reports
    • Harbour Masters Directions
  • About
    • Our Board
    • Management Structure
    • Employment
    • Tenders
  • Contact
    • Emergency Information
    • Report an Incident
    • Feedback and Enquiries
  • Home
  • Boating
    • Safety
      • Cautions
      • Crossing Bars
    • Webcams
    • Waves, Tides & Weather
    • Navigation Information
    • Waterways Online
    • Boating Guides
    • Boating Facilities
  • Ports & Waterways
    • Port Management
      • Port of Anderson Inlet
      • Port of Corner Inlet & Port Albert
      • Port of Gippsland Lakes
      • Port of Mallacoota Inlet
      • Port of Snowy River (Marlo)
      • Lake Tyers
      • Shallow Inlet
      • Tamboon Inlet
      • Sydenham Inlet
    • Sand Management
    • Environment
    • Current & Planned Works
    • Permits & Authorities
  • Notices & Alerts
    • Notice to Mariners & Warnings
    • Media Releases & Local News
  • Services
    • Commercial Shipping
    • Commercial Services
    • Berths & Moorings
    • Online Site Induction
  • Publications
    • Plans
    • Bathymetric Surveys
    • Reports
    • Harbour Masters Directions
  • About
    • Our Board
    • Management Structure
    • Employment
    • Tenders
  • Contact
    • Emergency Information
    • Report an Incident
    • Feedback and Enquiries
Facebook-square
Close

NTM 051(T) OF 2020 – Note 253 (T) – 2019 is now cancelled

Notices to Mariners

Notice to Mariners

Port of Mallacoota Inlet

Bastion Point Boatramp, Mallacoota

DATE:  10 February 2020 DETAILS:  Notice to Mariners No.253(T) of 2019 is referred and cancelled. Recent continuous Easterly weather conditions and associated seas and swells have caused the Entrance and Approach Channel to the Bastion Point Boat Ramp to shoal. East Gippsland Shire has reported that shoaling has encroached across the width of the approach channel creating a sand bar at the entrance to the ocean access boat ramp. Least depths at the entrance and approach channel are unknown but surf is observed to break across the entrance. East Gippsland Shire will mobilise the Shire Dredger when environment conditions improve. Mariners are advised that transits of the approach channel and entrance should only be carried out during fine weather conditions and if there is sufficient height of tide taking into consideration the vessels draft, the existing sea state, predicted weather conditions for the duration of the voyage and the expected conditions and tide height for the time of return.   Passage through the approach channel should only be attempted by experienced vessel operators who possess sound knowledge of the conditions to be expected during the transit of the channel taking into consideration the prevailing weather and sea state at the time.
Download Notice

Share this post

Facebook
Twitter
Linkedin
Email
Print

Quick Links

Hover over a topic to view more available links & information.

Subscribe

Boating

Ports & Waterways

Notices & Alerts

Commercial Services

Publications

About

Boating

Overview
Safety
Webcams
Waves, Tides & Weather
Navigation Information
Waterways Online
Boating Guides
Boating Facilities

Ports & Waterways

Overview
Port Management
Sand Management
Ports & Waterways
Environment
Current & Planned Works
Permits & Authorities

Notices & Alerts

Overview
Notice to Mariners & Warnings
Media Releases & Local News

Commercial Services

Overview
Commercial Shipping
Commercial Fee for Service
Berths & Moorings
Online Site Induction

Publications

Overview
Plans
Bathymetric Surveys
Reports

About

Overview
Our Board
Management Structure
Employment
Tenders

Gippsland Ports is a Committee of Management established in 1996 to manage the State Government™ Ports and Harbours functions for the five designated local ports of Gippsland.

Head Office

  • 97 Main Street, PO Box 388, Bairnsdale, VIC 3875
  • (03) 5150 0500
  • (03) 5150 0501
  • feedback@gippslandports.vic.gov.au

Lakes Entrance Office & Depot

  • Bullock Island, Lakes Entrance, VIC 3909
  • (03) 5155 6900
  • (03) 5155 6901

Bullock Island Boatyard

  • (03) 5155 6950

Paynesville Boatyard

  • Slip Road, Paynesville, VIC 3880
  • (03) 5156 6352
  • (03) 5156 6816

Port Welshpool

  • 84 Lewis Street, Port Welshpool, VIC 3965
  • (03) 5688 1303
  • (03) 5688 1658

Copyright All Rights Reserved © 2024

  • Privacy Policy
Website by Small Dog Design

Subscribe

Subscribe to receive regular email updates

Loading